Project Details
This building has been recladded with profile 6 fibre cement sheets together with a two piece closed ridge and barge boards to suit
We installed a new pedestrian door opening to the left hand side of the roller shutter door
New Brett Martin deep flow guttering was installed to both sides
A new roller shutter and pedestrian door in Olive Green are to follow