Warmingham – New Steel framed insulated storage and workshop building
Project Details
New Steel framed insulated storage and workshop building
This was a complete turn key job from the foundations up to the completion of the building
We concreted the internal floor area and finished the top with a power float finish and the front apron had a brush finish on the concrete pads
Outside the building was stoned up around the perimeter of the building and to the yard/polytunnel with Staffordshire pink gravel
The roof and walls were cladded with 40mm insulated composite panels in juniper green with flashings to suit
A Juniper green roller shutter door and a pedestrian door were supplied and installed to finish the building off